Home/Data center solutions

Data centers,built and testedin a Schneider-audited factory.

Factory-integrated AIDC infrastructure from a single rack to multi-megawatt clusters. Power, cooling, racks and monitoring are integrated at our Hangzhou base, a Schneider Electric-audited supplier, and pass FAT before shipping. The site only lifts, connects and commissions.

WincoTek containerized data center campus, rendering
Delivered
6 projects
Countries
5
IT capacity
1.24 MW
Scale
Rack to 10 MW+
Why factory-integrated

Move the build off site. Keep the quality.

Conventional builds stack months of multi-trade work on site. We fabricate, integrate and test every module under factory control, and ship it ready to connect.

01

Integrated

Power distribution, cooling, IT racks, containment, fire protection and DCIM in one engineered system.

02

Tested

Incoming, in-process and system inspection, then factory acceptance testing before release.

03

Deployed

On site: placement, interconnection and commissioning. Containerized builds go live up to 60% faster than a traditional build.

04

Scaled

Start with one module and add capacity block by block; each module runs independently.

Range

One rack to multi-megawatt.

The same building blocks repeat at every scale. Tell us the IT load and site, and we size the configuration.

KilowattsMegawatts
01 · Rack

LS Series server rack

42U / 47U

12 models, 600 / 800 mm wide, 1,000–1,200 mm deep, 3,000 kg static and dynamic load. Details →

02 · Edge

Warrior edge MDC

1 cabinet

UPS 3–10 kVA, rack AC 3.5–8.1 kW, PDU, FM200 / Novec 1230, monitoring and access control in one enclosure. Details →

03 · Micro

Wizard MDC

Up to 9 IT racks

1+1 to 1+9 cabinet rows; UPS 10–30 kVA in N, N+1 or 2N; on-site installation in a day or less. Details →

04 · Modular

WT-MMDC micro-modular

≤125 kW / module

Up to 24 cabinets single aisle or 48 dual aisle; UPS 25–125 kVA, in-row AC 25–60 kW. Details →

05 · AI

AI POD overhead

≤250 kW / rack

42–46 racks and 2.2–8.0 MW per pod; busway to 6,300 A; 5 MW liquid thermal capacity. Details →

06 · Liquid

WT-CDU rack CDU

30–150 kW

Five models, 4U to 12U; N+N pumps, dual power feeds, leak detection, Modbus / TCP/IP. Details →

07 · Campus

Containerized, air or liquid

100 kW to 10 MW+

1.25 MW standard blocks, 10–150 kW+ per rack, UPS to 5,000 kVA+, −40 to +55 °C. Details →

WincoTek Warrior edge micro data center

Edge and micro data centers

Warrior and Wizard bring a complete computer room to bank branches, carrier business halls, campuses and edge nodes, without building a server room.

WincoTek WT-MMDC micro-modular data center

Micro-modular rows

WT-MMDC rows for telecom operators, enterprises and financial institutions. Seven units deliver 630 kW across 126 racks in Azerbaijan.

WincoTek AI POD prefabricated overhead infrastructure

AI POD for accelerated compute

The overhead services that normally take months on site, prefabricated as one steel-framed pod and lifted into place.

WincoTek containerized liquid-cooled data center

Containerized liquid cooling

IT hall, electrical pod and cooling plant in factory-built container modules for AI and HPC, relocatable and outdoor-ready.

Key specifications

ProductScaleRack densityPowerCoolingFire / monitoring
LS Series rack42U / 47U, 12 models—Dual vertical PDU slotsMesh doors, >80% open—
Warrior1 cabinetTo 8.1 kWUPS 3 / 6 / 10 kVA, on-lineRack AC 3.5 / 4.2 / 8.1 kWFM200 / Novec 1230, web + email alerts
Wizard1+1 to 1+9 cabinetsBy IT loadUPS 10–30 kVA; N, N+1, 2NIn-rack or in-row, contained aisleGas suppression, web + mobile DCIM
WT-MMDC≤24 / ≤48 cabinets2–5 kW in delivered sitesUPS 25–125 kVA, ≥96%; ≤125 kW / moduleIn-row AC 25–60 kW; DX or chilled waterFM-200, DCIM
AI POD42–46 racks, 2.2–8.0 MWTo 250 kWBusway to 4,000 A (2Bus) / 6,300 A (4Bus), 600 VTCS piping, DN250 header, 5 MW / podModbus, BACnet, leak detection
WT-CDUY30 to Y15030–150 kW / unit0.7–3 kW ratedPrimary 35/45 °C; PG25 secondaryModbus, TCP/IP, UDP
Containerized100 kW–10 MW+, 4–100+ racks10–150 kW+UPS 100–5,000 kVA+; N, N+1, 2N; Li-ionAir, liquid or hybrid; −40 to +55 °CFM200 / Novec 1230, BA + DCIM

Actual values depend on project configuration. Full datasheets on request.

Subsystems

Four systems, engineered as one.

Supplied as standalone products or integrated into a complete AIDC module.

Power distribution

  • Distribution panels
  • Integrated UPS
  • Intelligent busway
  • Rack PDU and RPP

Cooling

  • Precision and in-row AC
  • CDU and manifolds
  • Fan walls, dual-coil chilled water
  • Air-cooled chillers, dry coolers

Racks & containment

  • Server and liquid-cooling racks
  • Cold and hot aisle containment
  • Prefabricated overhead systems
  • Cable management

Monitoring & safety

  • DCIM platform and sensors
  • Access control
  • Gas fire suppression
  • VESDA early detection

Air-cooled path

10–30 kW per rack, for enterprise, telecom and edge.

IT racks→Contained aisle→Precision cooling→Outdoor heat rejection

Liquid-cooled path

Cold-plate, dual-loop: 50–150 kW+ per rack at a lower PUE, for AI and HPC.

Cold plate→CDU→Primary loop→Chiller / dry cooler
Reference configurations

Liquid-cooled blocks, sized to the cluster.

Engineering examples from our design library. Every project is configured to its own load, redundancy and climate.

Single module
0.6 MW
  • 1× dual-40 ft module
  • 6 liquid-cooled racks, 100 kW each
  • 2N power, 10-minute Li-ion
  • Chilled water + free cooling
Two IT PODs
2.0 MW
  • 18 liquid-cooled racks
  • 2N redundancy for IT and chillers
  • 10-minute Li-ion backup
  • Phased expansion
Multi-module
3.0 MW
  • 5× dual-40 ft modules
  • 30 liquid-cooled racks, 100 kW each
  • 2N power, 10-minute Li-ion
  • Magnetic-bearing chillers, Novec 1230 + VESDA
Campus
5 MW
  • 100 kW+ per rack
  • 2N UPS, 10-minute Li-ion
  • Magnetic-bearing or water chiller with free cooling
  • Novec 1230 + VESDA

More configurations →

Delivery model

One process, definition to lifecycle.

Manufacturing builds the platform; integration turns it into an operating data center. After handover we support operations, spares and expansion.

01

Requirements

Load, racks, density, climate, power.

02

Engineering

Structure, electrical, HVAC, monitoring, fire drawings.

03

Manufacturing

Fabrication and assembly.

04

Integration

All disciplines connected.

05

FAT

Tested before release.

06

Deployment

Lift, connect, commission.

07

Lifecycle

Remote monitoring, spares, upgrades.

Delivered projects

1.24 MW delivered in 5 countries.

Scope in each: layout design, power and cooling integration, factory build, FAT and delivery.

CountryTypeIT capacityRacksPer rackUPSCoolingBackupConfiguration
KazakhstanAir-cooled containerized168 kW247 kW2NN+1 in-row20 min VRLA3× 40 ft units
IraqAir-cooled containerized120 kW206 kW2NN+1 in-row2 h VRLA3× 40 ft units
EthiopiaAir-cooled containerized40 kW85 kW2NN+1 in-row60 min VRLA1× 40 ft module
KazakhstanAir-cooled containerized45 kW95 kWNN+1 in-row10 min VRLA3 modules, 15 kW each
AzerbaijanIndoor micro-modular630 kW1265 kW2NN+1 in-row15 min Li-ion7× WT-MMDC
BruneiIndoor micro-modular240 kW803 kW2NN+1 in-row1 h VRLA5× WT-MMDC
In progress

7.2 MW liquid-cooled containerized

6× 1.2 MW B200/B300 GPU cluster blocks: 12 IT PODs, 14 electrical PODs and 4 auxiliary PODs, 72 liquid racks, 2N for IT and chillers.

In progress

40 MW liquid-cooled containerized

16× 2.5 MW compute blocks at 50 kW per rack, N+1 power and N+1 cooling.

Also in China

WT-MMDC for public safety and banking

Public safety: 3 units, 360 kW, 120 racks. Banking: 8 units, 224 kW, 112 racks; and 8 units, 300 kW, 150 racks. All 2N UPS, N+1 in-row cooling, FM-200.

Manufacturing network · Hangzhou

Built at a Schneider-audited base in Hangzhou.

Modular, containerized, air and liquid-cooled systems are fabricated, integrated and tested at our Hangzhou manufacturing base, an audited supplier to Schneider Electric, with quality controlled from incoming inspection to final release.

2009In production since
48,000 m²Manufacturing area
200+Staff
WincoTek micro-modular data center rows installed on site

Send IT load, rack count, kW per rack, climate and power supply.

We return a matched configuration with layout and lead time.

FAQ

Data center questions.

Not answered here? Email waley@wincoteknetwork.com or message us on WhatsApp.

What does factory-integrated mean?

Power distribution, cooling, IT racks, containment, fire protection and DCIM are integrated and tested in the factory, then pass FAT before shipping. On site the modules are placed, connected and commissioned.

What scale can you deliver?

From a single LS Series rack or Warrior edge cabinet to containerized campuses of 10 MW and more, built from 1.25 MW standard blocks.

Do you support liquid cooling for AI?

Yes. Rack CDUs from 30 to 150 kW, AI POD overhead systems rated up to 250 kW per rack, and containerized liquid-cooled data centers for AI and HPC.

Where have your data centers been delivered?

6 projects in 5 countries, 1.24 MW of IT capacity in total, including Azerbaijan and Brunei.

Where are they built?

At the Hangzhou base, a Schneider Electric-audited supplier with 48,000 m² of plant, building data center infrastructure since 2009.

WhatsApp